Airport
Communication
Electricity
Industrial Parks
Postal
Railway
Road
Sea Port
Water

INFRASTRUCTURE & SUPERSTRUCTURE  
Water  
WATER SUPPLY BY STATION, 1998
Station Average Daily Storage Design
  Supply Capacity Capacity
  (ML/D) (ML) (ML/D)
Total 589.32 327.67 631.23
Kota Kianbalu 232.11 102.7 270.00
Papar 13.50 12.96 9.00
Tuaran 6.60 26.67 7.92
Sandakan 19.17 42.47 30.00
Kinabatangan 58.78 1.14 62.00
Telupid 2.77 1.40 1.75
Beluran 2.99 1.50 2.28
Tawau 95.00 55.79 90.00
Lahad Datu 23.50 20.68 28.8
Semporna 5.80 2.27 4.50
Kunak 6.20 2.10 4.80
Keningau 26.00 7.51 20.5
Tambunan 7.20 3.10 7.20
Tenom & Kemabong 5.80 4.08 5.10
Nabawan 0.55 0.91 0.55
Sook 0.24 0.40 0.50
Beaufort & Kuala Penyu 28.45 12.23 28.80
Sipitang 3.23 2.32 4.50
Membakut 4.10 1.35 4.54
Kudat 3.60 12.01 3.40
Kota Marudu 25.16 1.02 23.26
Pitas 1.14 1.14 2.27
Kota Belud 130.45 10.12 15.00
Ranau 4.00 1.80 4.56
Note: Excludes Wilayah Persekutuan Labuan
ML-Million Litre
ML/D- Million Litre Per Day

The provision of water is under the purview of the State Government of Sabah.

Water Department Sabah

During the Sixth Malaysia Plan (RM6) the Water Department spent an estimate RM$ 317 million upgrading services to consumers both in the Urban and Rural areas.

The Water Department will continue to develop and improve the Water Supply System in Sabah to provide adequate and good quality water to meet the increasing demands from consumers in Sabah. In the Seventh Malaysia Plan (RM 7), the allocation for the five year plan period totals RM$ 82.3 million under continuation projects. The Water Department has requested RM$ 3.174 billion for new projects under the Seventh Malaysia Plan. The aim of the plan is:

To provide good quality and adequate quantity of Water Supply to meet the immediate and increasing demand from consumers due to rapid economic development, particularly in the industrial and commercial sectors.

To provide satisfactory services including provision of effective and efficient billing and revenue collection system.

To enhance the Socio-Economic objectives in accordance with national Policy, i.e. to ensure 80% of the rural population in Sabah will be provided with a Water Supply System.

Apart from the allocation mentioned above, a total of RM$182.0 million allocation is expected from the Federal Government in the form of a Soft Loan which will be utilised to finance immediate improvement including improvement works on leakage control systems and non-revenue water (NRW) throughout the major towns in Sabah and improvement of the distribution water system in both urban and rural areas.

The Ministry has proposed to privatise the billing and revenue collection system throughout the State under the Seventh Malaysia Plan (RM7).

In line with the above plan and Privatisation Policy of the State Government, the Ministry also encourages the privatisation of water distribution and production systems throughout the districts. These will reduce some of the State's financial burden on the cost of maintenance and operation of the Water Treatment Plants in Sabah and enhance the efficiency and effectiveness of the service in Sabah.

^ Top Of Page


 
 All information are compiled by Jesselton Communications Sdn.Bhd. 2000.